VIZSLA SILVER DRILLS MULTIPLE HIGH-GRADE INTERCEPTS, INCLUDING 1,017 G/T SILVER & 8.19 G/T GOLD OVER 13 METRES TRUE WIDTH AT COPALA

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Algemeen advies 16/06/2024 07:25
Vancouver, British Columbia (June 12, 2024) – Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt:
0G3) (“Vizsla” or the “Company”) is pleased to report results from 12 new drill holes targeting the Copala
resource area at its 100%-owned, flagship Panuco silver-gold project ("Panuco" or the "Project") located
in Mexico. The reported drilling, designed to infill near-surface mineralization, successfully confirmed
high-grade continuity throughout Copala.
Highlights
• CS-24-354 returned 1,503 grams per tonne (g/t) silver equivalent (AgEq) over 13.00 metres true
width (mTW) (1,017 g/t silver and 8.19 g/t gold)
o Including 6,229 g/t AgEq over 1.40 mTW (4,124 g/t silver and 35.11 g/t gold)
o And 3,813 g/t AgEq over 1.31 mTW (2,540 g/t silver and 21.30 g/t gold)
• CS-24-344 returned 1,363 g/t AgEq over 8.70 mTW (1,096 g/t silver and 5.18 g/t gold)
o Including 10,516 g/t AgEq over 0.66 mTW (8,720 g/t silver and 36.60 g/t gold)
• CS-24-352 returned 2,872 g/t AgEq over 5.00 mTW (1,378 g/t silver and 22.95 g/t gold)
o Including 4,681 g/t AgEq over 2.75 mTW (2,115 g/t silver and 39.10 g/t gold)
• CS-24-347 returned 2,440 g/t AgEq over 6.00 mTW (1,882 g/t silver and 10.31 g/t gold)
o Including 4,957 g/t AgEq over 2.39 mTW (3,859 g/t silver and 20.51 g/t gold)
“New drill results from our ongoing Copala infill program continue to demonstrate excellent continuity of
high-grade silver and gold mineralization,” commented Michael Konnert, President & CEO. “As we reduce
the drill spacing at Copala, focused on converting mineralization to higher confidence resource categories,
we continue to expand the high-grade precious metals core of the main structure, and in-turn the overall
potential minable inventory. This is important as we progress through our 2024 de-risking initiatives
including the delivery of a Preliminary Economic Assessment planned for early Q3.”

see & read more on
https://vizslasilvercorp.com/site/assets/files/7697/2024-06-12_vizsla_silver_copala_main_final_1.pdf



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL